Saturday, November 8, 2008

A sub floor to sit on for coffee break

We're up to July at site prep and now the subfloor is in.  Terry, Jim and Chris are "testing" it.   Jim is sitting about where the front door will be facing south.  At Robin and Don's suggestion, we go with subfloor sitting on top of the foundation wall and we're using the OSB type "silent" trusses.   Floor is topped with plywood sheeting painted by Dick Horton's Painting.   This painted floor could be with us for a number of years yet and it will see lots of rain before it gets closed in with a roof in the fall....meaning November....but hold on as there is lots more before we get to that point.