Saturday, November 8, 2008

First step in site reassembly

Now it is mid August and we have the logs disassembled at Ronn's log yard and put on to two trucks - but to start the operation we need a crane.  Ace crane operator Frank Smith from Sterling Crane arrived on August 18 at the Blind River site with a 30 ton rough terrain Tadano.  We learn as the reassembly goes on that we could not have found a more talented crane operator than Frank when it comes to log house construction (or likely just about any other crane manouver).