Catherine taking a break to warm up. It got to -18C on December 12, which was a long day finishing the vapor barrier and then sweeping the snow out of the main floor. Next year we will smile about this as we watch the snow swirl around from inside the house with a nice cup of tea (or glog...).
Full scribe Scandinavian style round log home construction project named Angara. This is the story of the building and finishing of a custom log home in Ontario, Canada.
Suppliers - services and materials
Showing posts with label Fall 2008. Show all posts
Showing posts with label Fall 2008. Show all posts
Tuesday, December 16, 2008
Warming up in the basement
Catherine taking a break to warm up. It got to -18C on December 12, which was a long day finishing the vapor barrier and then sweeping the snow out of the main floor. Next year we will smile about this as we watch the snow swirl around from inside the house with a nice cup of tea (or glog...).
Snow everywhere
Finally the north and south sides are shingled!
Early December sees the shingling done on the north and south sides including gables. All that is left is the west and east side porch roof shingling, which we are leaving until spring because we need to stage off of these two sections of roof to install the east and west gable end siding and soffit. These two sides are fully protected with ice guard and they are good an watertight for now.
There is so much snow that you cannot actually see that the shingling is done, you will have to trust me on this..... Note that it looks sweet now with the windows and doors in place.
Sweeping and covering the roof to finish shingling
November 25 and it is a long cold walk to the outhouse
Winter is a little merciless this year. Catherine gazes out the window of the trailer and thinks warm in preparation for her next visit to the outhouse. It looks as though the snow is going to stay. This week we see temperatures down to -12 C and that made the propane furnace in the trailer work pretty hard. Bob kindly gets up in the night to switch propane tanks when we run out. Not the camp shower still hanging on the post but it is frozen now!
Jim installs the door hardware
Sausage roll in place
Bob holding a window/door sausage roll
You can see how bundled up Bob is - late November is cutting it close for getting windows and doors in for northern Ontario! Bob is holding one of the "sausage rolls" that we made out of 6 mil plastic vapor barrier, pink fiberglass insulation and Tuck tape. The bags are squared and loosely packed to allow for them being compressed in the opening at the top of each window and door in the log part of the house. These "sausages" allow for insulation, vapor barrier and an air seal while the house settles.
Window and door frames next
Here is a window frame set in between the two side spline assemblies. A space is left between the top of the squared frame and the window opening to allow for settling and vertical compression of the logs (will be 6% nominal). A piece of roll foam is set at the bottom of the frame and toed into the slot in the wall for a water and air tight fit.
Sunday, November 9, 2008
View of the windows and doors in the basement entry
At November 4 this shot shows the windows and doors in the gables and gable ends as well as in the basement entry on the west side. Great work by Don's crew getting those in. Also thanks to Elaine for her help in sanding down the west side of the logs and more views of Bob's staining handiwork. From this view the many loads of fill positioned by JI Enterprises (Joseph's guys) is visible - over 500 loads of fill. John Roy has done lots of backhoe work but he's hard to catch on camera....
South side shingling
North side done to past the gable peak
North side shingling
Armour Guard on the roof
Angara is taking shape as a house. The pine facia is on and staining of the logs and facia is underway. Special kudos to Chris for doing the eve extender and high end log staining. The roof is clad with plywood and the front arch is filled in and shaped. Armour Guard (ice guard) membrane is covering the whole roof and starter shingling was laid out by Don Chris and Jim for the brothers and friends crew to work on November 1 and 2. Don, Chris and Jim were incredibly generous with their help and guidance for the set up and first "brothers and friends" day.