Saturday, August 8, 2009

Framing starts

April and May see Bob starting to frame the first two rooms, a bedroom bathroom combination in the basement. Initially we plan to use it as a place to shower and watch TV or access the internet while we stay at the trailer on site. See on the right at the end is the main electrical panel that was put in last fall and the temporary insulation/vapor barrier that we had in the basement ceiling (first floor's joists) so that we could keep the basement heated through last winter. This came out in April because we'll be insulating the gable ends, gables and ceiling to heat the whole house this coming heating season.