Thursday, August 26, 2010

Progress on panelling the arch


We are making progress on the inside of the arch at the front door and the soffit along the front of the house.   The outside round of aluminum soffit is all done, but the other three sides of inside/long sections of soffit remain to be done.   We need to pull wire for the lighting as we go, which will make the later electrical hook up much easier.   Next we need to remove some of the pole scaffolding to the west so that we can set up to do the short TIG pine panel installation for the outside edge of the arch.   Also we have to drill holes in the arch log for the eye bolt to support the Angara log sign, every step has a few catches....